Ranch Home in Village of Sugarcreek
2,770 Sq. Ft. | Corner Lot |3 Bedroom | 2 Full Baths | 2 Car Garage | Sugarcreek Township | Tuscarawas County | Garaway Schools
ONLINE ONLY
Closes Monday June 13th, 2022, at 5:00 PM features extended bidding
Open House is Wednesday June 1st from 4:00-6:00 PM
Location: 112 SW Third St. Sugarcreek, OH 44681. From W Main St, take 3rd St SW for .2 miles to property. Signs Posted!
Summary: This home has a great Sugarcreek location as you are walking distance from downtown. The home was built in 1958 on a slab foundation and features a large eat-in-kitchen equipped with appliances and plenty of cabinet space, a spacious living room with a fireplace, 3 oversized bedrooms and two full baths. Additionally, there is an attached 2 car garage. Mechanics of the home include a gas furnace, gas water heater (rented), air conditioning, and both city water and sewer. Schedule your private showing or join us at the open house to look at this property.
Legal: Tuscarawas County Parcel #58-00300-000. Sugarcreek Township, Garaway Schools.
Taxes: Taxes are currently $993.80/half.
Terms: 5% Buyer’s Premium. Online bidding terms apply. 10% nonrefundable down payment day of sale with the balance due at closing. Closing in 45 days and possession. No financing or other contingencies, property sells “AS IS”. Any required inspections must be completed prior to bidding. Property sells subject to all articles of record.
Sale: By the order of Alva Hardesty Trust
Agent: Cliff Sprang, REALTOR® / Auctioneer
(330) 464-5155
• Any inspection of the purchase and title documents by buyer's council must be done prior to bidding.
• Any bid submitted during the sale is binding upon the bidder until the sale is concluded and the winning bidders are declared. It is possible the previous bids can become the winning bids if other combinations cause them to move back into winning position.
• The auto-extend feature for online only real estate sales will be 5 minutes for the first 30 minutes of extension. If there has been 30 minutes of extension past the stated soft-close time the extension time will fall to 3 minutes.